Bantry BT-R-05

A 2.33 hectare site zoned new/proposed residential (BT-R-05), on the 2026 zoned-land tax map, outside the mapped flood zones. 10 planning applications on the site and 70 within 300 m are in the national planning dataset.

Cork County Council · 2.33 ha · Boundary from the zoned-land tax map. Open in OpenStreetMap

Report SR-20261125-BT-R-05, version 1 · 2026-11-25 · Site planning report · Siteline

At a glance

Some issuesSeveral things need checking or managing, none of them a stopper on the evidence here.

Site
2.33 ha5.8 acres
Homes
about 46estimate, range 30–65
Break-even price
€372ka new home incl. VAT; too few sales to value land
New homes nearby
€320kmedian incl. VAT, P75 Bantry; 16 sales
Council decisions
19.3 weeksmedian; 66% took over 10 weeks

Worth checking

  • Permission. A scheme for 54 homes (21/833) was refused on appeal in February 2024. An application for 53 homes (26/2468) has been waiting for a decision since September 2026.
  • Water and services. Water and wastewater capacity isn't public in a re-usable form: ask Uisce Éireann.
  • Homes and value. Only 16 new homes sold in P75 Bantry in a year: too few to value the land. Break-even is about €372k a home including VAT; the local median, €320k, is below it.

No concerns

Zoning, flood, heritage and archaeology, protected habitats, and ground and surroundings.

Top risks and next steps

  1. Permission. Follow 26/2468 on the council's planning portal and ask the vendor about it. You
  2. Homes and value. Ask a local selling agent what new homes here would sell for before putting a value on the land. You
  3. Water and services. Make a pre-connection enquiry for a Confirmation of Feasibility. Uisce Éireann

21 facts read from public records, 1 estimates, 2 to confirm by hand. The outlook sums up constraints in the public record; it doesn't predict a planning decision. Money figures are indications, not a valuation.

What this means

The site and what's around it

Coláiste Pobail Bheanntraí - Bantry Community CollegeGaelscoil Bheanntraí26/2468: Awaiting decision26/2196: Invalid23/520: CONDITIONAL23/485: CONDITIONAL23/416: REFUSED23/192: CONDITIONAL22/783: CONDITIONAL22/547: REFUSED21/833: CONDITIONAL20/280: CONDITIONAL20/15: CONDITIONAL19/605: CONDITIONAL18/327: CONDITIONAL16/743: CONDITIONAL16/533: CONDITIONAL16/504: Invalid16/97: CONDITIONAL15/530: UNCONDITIONAL15/2: CONDITIONAL14/646: Invalid14/621: Invalid13/678: CONDITIONAL13/636: CONDITIONAL13/5: CONDITIONAL12/775: Invalid12/537: CONDITIONAL12/27: CONDITIONAL10/805: CONDITIONAL10/697: CONDITIONAL10/691: Invalid10/445: REFUSED10/427: REFUSED10/409: Invalid10/413: Invalid09/2165: CONDITIONAL09/2145: Invalid09/2110: CONDITIONAL09/2111: Invalid09/1102: CONDITIONAL09/1035: Invalid08/461: CONDITIONAL08/301: Invalid07/3149: CONDITIONAL07/2428: CONDITIONAL07/2213: CONDITIONAL07/1999: Invalid07/1996: REFUSED07/1509: Invalid07/699: Withdrawn07/662: CONDITIONAL07/418: CONDITIONAL07/284: CONDITIONAL06/996: Withdrawn06/781: CONDITIONAL06/279: CONDITIONAL05/8445: Withdrawn05/7748: CONDITIONAL05/7737: CONDITIONAL05/7433: CONDITIONAL05/7382: Invalid05/4089: CONDITIONAL05/3664: CONDITIONAL04/177: CONDITIONAL02/5708: CONDITIONAL02/4088: CONDITIONAL02/3376: CONDITIONAL02/842: REFUSED01/5539: CONDITIONAL01/3808: CONDITIONAL01/1791: REFUSED01/1036: CONDITIONAL00/5180: CONDITIONAL00/5132: CONDITIONAL00/2658: CONDITIONAL99/6365: CONDITIONAL99/3175: CONDITIONAL99/859: CONDITIONAL99/331: CONDITIONAL98/1698: CONDITIONAL98/251: CONDITIONAL100 mRoads © OpenStreetMap contributorsN
  • The site
  • Residential zoning
  • Town centre or mixed use
  • Open space, amenity or agriculture
  • Business or industry
  • Community, utilities or infrastructure
  • Flood zone A or B
  • Conservation area
  • Monument zone of notification
  • Heritage inventory building
  • Recorded monument
  • School
  • Railway station
  • Application granted
  • Application refused
  • Not decided, withdrawn or invalid

Zoning

PlanZone in the planTypeShare of siteDescription
Cork County Development Plan 2022ResidentialNew/proposed residential100%Promote development mainly for housing, associated open space, community uses and, only where an acceptable standard of amenity can be maintained, a limited range of other uses that support the overall residential function of the area.

BT-R-05: Medium B Density Residential Development with appropriate access. New development should be set back from watercourses on the boundary of this zone. Traffic impact Assessment. (specific objective, from the 2026 zoned-land tax map)

Zoning comes from the Department of Housing's national zoning map (myplan.ie), which puts each council's plan into common types. Cork County Council's own plan is the legal source (plan document); check it, and any later variation, before relying on the zoning.

Planning route

What a housing scheme of the estimated size would go through here.

Housing permissions within 2 km

7 housing schemes of 5 or more homes decided within 2 km in the last 6 years: 5 granted, 2 refused; median decision time 32.1 weeks.

RefReceivedHomesPer haProposalDecisionWeeksAway
22/5832022-096—Construct 6 no. dwelling houses and associated site worksGranted32.1 likely FI1.0 km
21/8332021-1254—Residential development consisting of the following: (i) 42 no. dwelling houses, 3 no. apartment blocks each including 4 no. apartments, and 2 no. ser…Refused
Refused on appeal, Feb 2024
40.7 likely FI0.0 km
21/5332021-0718—Permission sought to (A) Complete 8 no. dwellings (house numbers 17-24 inclusive) currrently at various stages of construction (permitted as part of D…Granted49.7 likely FI1.8 km
20/6242020-118—Demolition of 2 no. semi-detached dwellinghouses, construction of 3 no. detached dwellinghouses and apartment building consisting of 8 no. 1 bed units…Refused8.91.0 km
20/5272020-0936—Construction of 36 number residential units including all ancillary site services, landscaping and access roadsGranted28.1 likely FI1.6 km
20/4042020-0710—Permission for the following works to the Vickery's Inn Complex (previous planning refs: 14/00704 and 17/00537): A) change of use of 10 no. apartments…Granted18.7 likely FI0.7 km
20/1282020-037—Permission for the redevelopment of an existing three storey commercial/residential premises, incorporating The Anchor Tavern, the former Paper Shop a…Granted47.9 likely FI0.8 km

Homes are the larger of the recorded number and the number in the description. "Per ha" is homes per hectare of the recorded site area. The decision is the final one: where a scheme was appealed, An Coimisiún Pleanála's. This council doesn't record site areas in the national dataset, so densities can't be shown.

Planning history on the site

RefReceivedProposalDecisionWeeksDistance
26/24682026-09-22Permission is being sought for a residential development consisting of 45no. dwelling houses and 8no. apartments, and all associated site works including installation of roads, footpaths, playground and amenity areas, ve…Awaiting decision0 m
26/21962026-08-21permission for a residential development consisting of 45no. dwelling houses and 8no. apartments, and all associated site works including installation of roads, footpaths, playground and amenity areas, vehicle and bike p…Invalid0 m
21/8332021-12-01Residential development consisting of the following: (i) 42 no. dwelling houses, 3 no. apartment blocks each including 4 no. apartments, and 2 no. serviced sites, (ii) installation of playground, (iii) installation of 2 …CONDITIONAL
Refused on appeal, Feb 2024
40.7 likely FI0 m
10/4452010-06-251) Construction of 1 no. dwelling house and domestic garage 2) installation of wastewater treatment plant and 3) all associated site worksREFUSED7.40 m
10/4272010-06-181) Construction of 1 No. dwelling house 2) Construction of detached domestic garage 3) Installation of wastewater treatment plant and 4) all associated site worksREFUSED7.70 m
10/4092010-06-11Construction of 1 no. dwelling house, detached domestic garage, installation of wastewater treatment plant and all associated site worksInvalid0 m
10/4132010-06-11Construction of 1 no. dwelling house and domestic garage, installation of wastewater treatment plant and all associated site worksInvalid0 m
07/19962007-07-23Dwellinghouse and garageREFUSED80 m
07/15092007-06-08Dwellinghouse and garageInvalid0 m
07/6992007-03-12Dwellinghouse and garageWithdrawn0 m

Within 300 m

RefReceivedProposalDecisionWeeksDistance
23/5202023-09-15Conversion of attic to habitable accommodation and for new dormer windows and rooflights to sameCONDITIONAL7.788 m
23/4852023-09-01Retention of alterations and extensions to dwellinghouse and permission for demolition of existing porch and to undertake all associated site worksCONDITIONAL28.7 likely FI260 m
23/4162023-07-27Permission for alterations and construction of an extension to existing garage and for change of use of said garage into granny flat accommodation for use ancillary to the main dwelling and all associated site worksREFUSED
Refused on appeal, Jun 2024
19 likely FI159 m
23/1922023-04-11Construction of a building comprising offices, interview rooms, waiting areas, meeting rooms and ancillary accommodation. The proposal also includes for carparking spaces, cycle parking, hard and soft landscaping and all…CONDITIONAL12.3 likely FI225 m
22/7832022-12-21Construction of a dwelling house and all associated site worksCONDITIONAL8.7273 m
22/5472022-08-26Alterations and construction of extensions to existing garage and change of use of said garage into granny flat accommodation for use ancillary to the main dwelling, and all associated site worksREFUSED7.9159 m
20/2802020-06-04Permission for retention for minor alterations to Primary Healthcare Centre building permission under 16/00743 and 18/00327, retention of (a) minor alterations to elevations, internal layout and ridge levels, (b) minor i…CONDITIONAL25 likely FI240 m
20/152020-01-20Construction of a covered pedestrian walkway between Bantry General Hospital and Bantry Primary care centre and for the construction of a foul sewer and all associated site worksCONDITIONAL7.7298 m
19/6052019-09-20Construction of bungalow and associated site worksCONDITIONAL37.4 likely FI273 m
18/3272018-06-11Permission for the change of use from medical mobility equipment unit to dispensary and all associated site development worksCONDITIONAL
Granted on appeal, Apr 2019
7.6240 m
16/7432016-12-05Planning permission for the construction of a Primary Health Care Centre. The development will consist of the following (1) a split-level building ranging from two storeys to single storey. The building will contain HSE …CONDITIONAL8.1240 m
16/5332016-08-19The demolition of existing lean to boiler house and the construction of an extension and minor alterations to existing dwelling and all associated site works including the upgrading of the waste water treatment system an…CONDITIONAL6.954 m
16/5042016-08-08Demolition of existing lean to boiler house and the construction of an extension and minor alterations to existing dwelling and all associated site works including the uprading of the waste water treatment system and per…Invalid54 m
16/972016-02-19Alterations and extensions to an existing dwelling house, including the change of use of an attached garage to an art and hobby room and all associated site worksCONDITIONAL9.719 m
15/5302015-09-17Dwelling House and all associated site worksUNCONDITIONAL6.1226 m
15/22015-01-07Removal of 2no. existing wind turbines and provision of additional solar array to roof of Bantry Community College and and a new array installed on the roof of the Gaelscoil BheanntraiCONDITIONAL7.1148 m
14/6462014-11-10The removal of 2 nr existing wind turbines and provision of additional solar array to roof of Bantry Community College and a new array installed on the roof of the Gaelscoil BheanntraiInvalid148 m
14/6212014-10-28The removal of 2 nr existing wind turbines and provision of additional solar array to roof of Colaister Pobail and a new array installed on the roof of the Gael Scoil BheanntraiInvalid148 m
13/6782013-12-06Permission for demolition of main part of fire-damaged dwelling house, construction of replacement part of same with dormer design and all associated site worksCONDITIONAL12 likely FI25 m
13/6362013-11-15Construct a link building for habitable purposes between two number existing residential accommodation units and all associated site worksCONDITIONAL7.4164 m
13/52013-01-09Prefabricated metal shed for the storage of caretakers equipmentCONDITIONAL6.3280 m
12/7752012-12-19Prefabricated metal shed for the storage of caretakers equipmentInvalid280 m
12/5372012-08-21Construct a sluice room building to serve 4 no. existing accommodation unitsCONDITIONAL5.9164 m
12/272012-01-23To construct an extension to garage/storeCONDITIONAL5.3136 m
10/8052010-11-19Dwelling house and all associated site worksCONDITIONAL8.4226 m
10/6972010-10-15Construct a vehicular entrance to landsCONDITIONAL5.7223 m
10/6912010-10-12Construct a vehicular entrance to landsInvalid223 m
09/21652009-12-14Provision of 2 no. wind turbines each of height c.20m to be located at the southern end of the school site and which will serve the new primary and post primary school development which is subject of a separate, concurre…CONDITIONAL7.649 m
09/21452009-12-04The provision of 2 no. wind turbines each of height c.20m to be located at the southern end of the school site and which will serve the new primary and post primary school development which is subject of a separate, conc…Invalid49 m
09/21102009-11-18Development will comprise of the following: Construction of a part single/two/three storey post primary school (“Bantry Community College”) for educational purposes, which will accommodate c.700 pupils, comprising 47no. …CONDITIONAL9148 m
And 40 older applications within 300 m, not listed.

Of the 57 nearby applications with a decision, 53 were granted (93%) and 4 refused. "Likely FI" marks a decision that took more than ten weeks, which almost always means the council asked for further information. Across Cork County Council, 66.0% of housing applications decided in 2022-2025 took more than ten weeks, which usually means a further-information request. 18.7% were refused, and the median decision took 19.3 weeks.

Homes and money

At 20–35 homes a hectare (Medium B), and with 65–80% of the site usable for homes once roads and open space are allowed for, the site could take about 30–65 homes, 46 in the middle. The range comes from the plan's own density band for this zone (Cork County Development Plan 2022, Volume 1, Table 4.1, Objective HOU 4-7).

Local prices

New homes (median, including VAT)€320k16 sales; up 3% on a year earlier
Existing homes (median)€269k124 sales; up 6% on a year earlier
New homes, Cork County (2025)€425kexisting €340k; 1,843 new sales

P75 Bantry, 12 months to September 2026. Area chosen by: Eircode area named after the town. Source: CSO Residential Property Price Index (CC BY 4.0), from stamp duty returns; sales are household purchases (CSO HPM04). A median of fewer than 30 new-home sales isn't used to value land.

Break-even price

Only 16 new homes sold in P75 Bantry in the 12 months to September 2026. A median from so few sales can swing a long way, so no land value is worked out from it. Instead, this is the price new homes would have to sell for to cover average building costs and a normal profit, with nothing left for the land.

Homes4637 sold on the open market, 9 to the council under Part V at cost
Building and development costs€276k a homehouse, site works, roads and services, contributions and connections, fees, sales and finance
Builder's profit15%of all costs
Break-even price€372ka new home including VAT (€328k without); below this the land has no value for housing

Each €10,000 that new homes here sell for above €372k adds roughly €264k to what a builder could pay for the land for this scheme. Ask a local selling agent what new homes would sell for, and work from their figure.

An indication for a first look, not a valuation. Costs are the Department of Housing's Cork example for a 110 m² three-bed semi (Q1 2025 prices; Insights into Total Development Costs 2025, Department of Housing (prepared by Mitchell McDermott, December 2025; costs at Q1 2025)), the same for every site. Part V homes are counted at cost, a simplification; stamp duty on the land is allowed for in the figure per €10,000. Cork County Council's development contributions come to about €1,333 a home, inside the costs above.

Constraints checked

ConstraintResultNearest
Flood Zone A (Cork County Development Plan 2022)None within 100 m—
Flood Zone B (Cork County Development Plan 2022)None within 100 m—
Architectural Conservation AreaNone within 250 m—
Heritage buildings (national inventory)None within 250 m—
Recorded monumentsNone within 250 m—
Monument zone of notificationNone within 100 m—
Special Area of ConservationNone within 2,000 m—
Special Protection Area (birds)None within 2,000 m—

Ground and surroundings

RadonNot a high radon areaStandard radon measures apply to all new homes (TGD C).
Groundwater vulnerabilityExtremeMatters if the scheme needs its own wastewater treatment; on mains drainage it rarely does.
Landslide susceptibilityLowFrom the GSI's national map, at 1:50,000.

Licensed facilities and closed landfills within 500 m (EPA)

Schools and transport within 2 km

Water and wastewater

Uisce Éireann publishes capacity registers for every town, but its terms don't allow them to be reproduced, so they aren't summarised here. Look up the town on the capacity registers, and make a pre-connection enquiry for a Confirmation of Feasibility.

Route forward

From now to starting on site takes about 26–59 weeks (roughly 6–14 months) if there's no appeal. Indicative; each step's range is shown, darker for the quicker end.

Pre-application meeting
Request it early; councils book them weeks ahead.
4–8 wk
Surveys, design and reports
Topographical survey, design, and any reports the route needs.
8–16 wk
Council decision
8 weeks by law; at Cork County Council, 66% of housing decisions took over 10 weeks, usually because of a further-information request.
8–27 wk
Appeal period
Anyone can appeal within 4 weeks of the decision; an appeal adds months.
4 wk
Commencement notice
Lodged at least 14 days before work starts.
2–4 wk

Next steps

  1. You: Follow 26/2468 on the council's planning portal and ask the vendor about it.
  2. You: Ask a local selling agent what new homes here would sell for before putting a value on the land.
  3. Uisce Éireann: Make a pre-connection enquiry for a Confirmation of Feasibility.

Re-check before you bid: the planning data (weekly), the zoned-land tax map (each February), and any permission's expiry date in the council's file.

Questions to ask

The vendor or agent

  • Who applied for 26/2468, and will the sale wait for its decision?
  • Why was 21/833 refused on appeal?
  • Can you send the folio and title plan (Tailte Éireann Land Registry, landdirect.ie)? Are there rights of way, wayleaves, or pipes and cables crossing the site?
  • Has the owner made a rezoning request or a submission on the zoned-land tax map?
  • What have new homes near the site sold for in the last year, and what would they sell for now?

Your architect or engineer

  • Does a scheme of 30–65 homes work, given access, open space, Part V and any buffers?
  • Can we build here for less than the average cost, given new homes must sell for about €372k to cover it?

The council

  • Would the council support about 46 homes here, and how would it want Part V delivered?
  • What does objective BT-R-05 expect on density, access and landscaping?
  • Can we have a pre-application meeting before we submit?

Uisce Éireann

  • Is there water and wastewater capacity for 46 homes? (A pre-connection enquiry gets a Confirmation of Feasibility.)

Sources

Report SR-20261125-BT-R-05, version 1. Not yet checked. Prepared by Siteline (hello@sitelineplanning.ie). Siteline is a business name of Nathan Brosnan, sole trader, Cork.

This report compiles public information about the site. It isn't planning, legal or valuation advice and doesn't predict a planning decision. Check anything you rely on with the council and your own professionals. Map data is indicative; boundaries come from published map layers, not a survey.