Claregalway GALABCMA016

A 2.91 hectare site zoned new/proposed residential (Residential Phase 1 (R1)), on the 2026 zoned-land tax map, outside the mapped flood zones. No planning applications on the site and 20 within 300 m are in the national planning dataset.

Galway County Council · 2.91 ha · Boundary from the zoned-land tax map. Open in OpenStreetMap

Report SR-20261125-GALABCMA016, version 1 · 2026-11-25 · Site planning report · Siteline

At a glance

StraightforwardNothing in the public record stands in the way of a housing scheme; the usual checks still apply.

Site
2.91 ha7.2 acres
Homes
about 69estimate, range 47–93
Land value
€3.5man indication; €483k an acre, range €495k to €6.5m
New homes nearby
€461kmedian incl. VAT, H91 Galway; 465 sales
Council decisions
7.9 weeksmedian; 37% took over 10 weeks

Worth checking

  • Permission. No permission on the site: a full application is needed.
  • Protected habitats. Lough Corrib SAC is about 918 m away: Appropriate Assessment screening.
  • Ground and surroundings. High radon area: new homes need a radon membrane and sump, a build cost rather than a planning issue.
  • Water and services. Water and wastewater capacity isn't public in a re-usable form: ask Uisce Éireann.

No concerns

Zoning, flood, heritage and archaeology, and homes and value.

Top risks and next steps

  1. Protected habitats. Commission an Appropriate Assessment screening report. You
  2. Permission. Book a pre-application meeting with the council. You
  3. Ground and surroundings. Allow for radon measures (Technical Guidance Document C). Your builder
  4. Water and services. Make a pre-connection enquiry for a Confirmation of Feasibility. Uisce Éireann

20 facts read from public records, 2 estimates, 1 to confirm by hand. The outlook sums up constraints in the public record; it doesn't predict a planning decision. Money figures are indications, not a valuation.

What this means

The site and what's around it

Claregalway National School2561785: REFUSED2561079: CONDITIONAL2560252: CONDITIONAL2461773: CONDITIONAL2461652: CONDITIONAL2460083: CONDITIONAL2361411: CONDITIONAL2360973: CONDITIONAL2360403: N/A2260312: REFUSED21297: CONDITIONAL2118: REFUSED20640: CONDITIONAL203: CONDITIONAL191666: CONDITIONAL181387: CONDITIONAL181053: CONDITIONAL18859: CONDITIONAL171059: CONDITIONAL17672: CONDITIONAL100 mRoads © OpenStreetMap contributorsN
  • The site
  • Residential zoning
  • Town centre or mixed use
  • Open space, amenity or agriculture
  • Business or industry
  • Community, utilities or infrastructure
  • Flood zone A or B
  • Monument zone of notification
  • Heritage inventory building
  • Recorded monument
  • School
  • Railway station
  • Application granted
  • Application refused
  • Not decided, withdrawn or invalid

Zoning

PlanZone in the planTypeShare of siteDescription
Galway County Development Plan 2022-2028Residential (Phase 1)New/proposed residential100%To protect, provide and improve residential areas within the lifetime of this plan

Residential Phase 1 (R1): To protect, provide and improve residential amenity areas within the lifetime of this plan (specific objective, from the 2026 zoned-land tax map)

Zoning comes from the Department of Housing's national zoning map (myplan.ie), which puts each council's plan into common types. Galway County Council's own plan is the legal source (plan document); check it, and any later variation, before relying on the zoning.

Planning route

What a housing scheme of the estimated size would go through here.

Housing permissions within 2 km

6 housing schemes of 5 or more homes decided within 2 km in the last 6 years: 3 granted, 3 refused; median decision time 17.9 weeks.

RefReceivedHomesPer haProposalDecisionWeeksAway
24617732024-126222.2for: construction of 62 no. residential units comprising of: 25 no. 3 bedroom 2 storey terraced houses (Type A & Type D blocks), 6 no. 3 bedroom 2 sto…Granted27.1 likely FI0.2 km
24606932024-066424.1for: (i) construction of a residential development of 64 no. units (38 no. three-bed units and 26 no. two-bed units) comprising dwellings and duplex u…Refused
Refused on appeal, Apr 2025
7.70.7 km
24600832024-017426.4for development at a site which extends to 2.8 hectares. The development will consist of the following: 1. The construction of 74 no. residential unit…Granted7.90.1 km
23614112023-111436.4for the construction of a residential development comprising 14 no. units. The development will consist of: • 6 no. 3 bed semi-detached (2 storey) hou…Granted21.6 likely FI0.2 km
22603122022-041225.31.The construction of 12 no. residential units. These units will consist of: 2 no. 4 bedroom 2 storey detached houses, 2 no. 4 bedroom 2 storey semi-d…Refused
Refused on appeal, Dec 2023
17.9 likely FI0.1 km
221302022-026428.9for 64 no. residential units, comprising of 32 no. 3 bedroom semi-detached dwellings, 27 no. 3 bedroom terraced dwellings, 5 no. 3 bedroom detached dw…Refused7.40.6 km

Homes are the larger of the recorded number and the number in the description. "Per ha" is homes per hectare of the recorded site area. The decision is the final one: where a scheme was appealed, An Coimisiún Pleanála's.

Planning history on the site

RefReceivedProposalDecisionWeeksDistance
None found.

Within 300 m

RefReceivedProposalDecisionWeeksDistance
25617852025-12-04for change of use from the existing crèche and apartment (previous planning reference number 04/1202) to two semi-detached houses and all ancillary site worksREFUSED34 likely FI55 m
25610792025-08-07of an attic conversion as habitable spaceCONDITIONAL6.759 m
25602522025-03-11for an amendment of An Móinéar Buí housing development as permitted under Pl. Ref. 24/60083. The proposed amendments consist of the following: Relocation of the permitted pedestrian connectivity infrastructure (2m wide) …CONDITIONAL5.3152 m
24617732024-12-19for: construction of 62 no. residential units comprising of: 25 no. 3 bedroom 2 storey terraced houses (Type A & Type D blocks), 6 no. 3 bedroom 2 storey semi-detached houses (Type C blocks), 3 no. 2 bedroom 2 storey ter…CONDITIONAL27.1 likely FI153 m
24616522024-12-04for the amendment to An Móinéar Buí housing development as permitted under Pl. Ref. 24/60083. The proposed development consists of the following: 1. Amendments to the boundary treatment scheme of the residential developm…CONDITIONAL8144 m
24600832024-01-26for development at a site which extends to 2.8 hectares. The development will consist of the following: 1. The construction of 74 no. residential units comprising: a. 6 no. one-bed apartments, b. 7 no. two-bed apartments…CONDITIONAL7.9141 m
23614112023-11-24for the construction of a residential development comprising 14 no. units. The development will consist of: • 6 no. 3 bed semi-detached (2 storey) houses, • 8 no. apartment units, comprising of 4 no. 1 bed ground floor u…CONDITIONAL21.6 likely FI162 m
23609732023-08-18for the provision of a timber shed structure in the rear garden area of the dwellingCONDITIONAL5.9106 m
23604032023-04-20for development at a site which extends to 2.86 hectares consisting of the following: 1. The construction of 75 no. residential units comprising: a) 6 no. one-bed apartments, b) 7 no. two-bed apartments, c) 19 no. three-…N/A139 m
22603122022-04-011.The construction of 12 no. residential units. These units will consist of: 2 no. 4 bedroom 2 storey detached houses, 2 no. 4 bedroom 2 storey semi-detached houses, 4 no. 3 bedroomed 2 storey terraced houses and 4 no. 2…REFUSED
Refused on appeal, Dec 2023
17.9 likely FI72 m
212972021-03-04to convert attic to habitable space. Gross floor space of proposed works: 38.5 sqmCONDITIONAL7.668 m
21182021-01-13for the construction of a dwelling house, domestic garage, connection to existing services and all associated site works. Gross floor space of proposed works: House: 207.4 sqm, Garage: 39 sqmREFUSED7.952 m
206402020-05-26for permission for one existing classroom in the school to be used as a Before and After School Service. Gross floor space of proposed works; 96.6sqmCONDITIONAL7.9238 m
2032020-01-02of dwelling granted under ref: 3338 on revised boundaries, along with revisions to dwelling to include, attic conversion, extension to rear with minor variations to elevations with all associated site works & connection …CONDITIONAL12.1 likely FI287 m
1916662019-10-25of minor variations to an existing 2-storey dwelling house as constructed, and all associated site development works, previous planning reference no. 04/1054 and no. 09/604 at Site No. 8, Sli na Bhradain. Gross floor spa…CONDITIONAL7.6263 m
1813872018-10-03of an attic conversion at 5 Slí an Bhraidain. Gross floor space of work to be retained 34.5 sqm.CONDITIONAL7.7229 m
1810532018-07-26to the grant of outline permission (Pl. Ref. No. 10/791) is sought to construct a dwelling house, domestic garage, septic tank with ancillary effluent treatment plant and all associated site services (Gross floor space 1…CONDITIONAL7.7198 m
188592018-06-22to convert attic to habitable space. Gross floor space of proposed works 20.38 sqm.CONDITIONAL7.699 m
1710592017-07-19to construct a single storey 6 Classroom standalone block with ancillary SET rooms to the northern end of existing school property with connections to services and all other associated site works. Gross floor space of pr…CONDITIONAL7264 m
176722017-05-12for the construction of 14 single storey Sheltered Housing Units (first floor of 81.58sqm per unit) and for the construction of a single storey Day Care Centre (floor area of 296.38sqm) including access road, car parking…CONDITIONAL7.932 m

Of the 19 nearby applications with a decision, 16 were granted (84%) and 3 refused. "Likely FI" marks a decision that took more than ten weeks, which almost always means the council asked for further information. Across Galway County Council, 37.2% of housing applications decided in 2022-2025 took more than ten weeks, which usually means a further-information request. 37.5% were refused, and the median decision took 7.9 weeks.

Homes and money

At 25–40 homes a hectare (Small or medium town (1,500-5,000 people), edge), and with 65–80% of the site usable for homes once roads and open space are allowed for, the site could take about 47–93 homes, 69 in the middle. The range comes from the national guidelines' range for this kind of town (Sustainable Residential Development and Compact Settlements Guidelines for Planning Authorities, Department of Housing, January 2024, Tables 3.1-3.7).

For comparison, 3 housing permissions within 2 km had a median density of 26.4 homes a hectare (gross site area).

Local prices

New homes (median, including VAT)€461k465 sales; up 10% on a year earlier
Existing homes (median)€403k1,072 sales; up 7% on a year earlier
New homes, Galway County (2025)€430kexisting €316k; 281 new sales

H91 Galway, 12 months to September 2026. Area chosen by: Eircode area most used in Property Price Register addresses for the town. Source: CSO Residential Property Price Index (CC BY 4.0), from stamp duty returns; sales are household purchases (CSO HPM04). A median of fewer than 30 new-home sales isn't used to value land.

Indicative land value

What a builder could pay for the land and still cover costs and a normal profit. This is the "residual" method.

Homes6955 sold on the open market, 14 to the council under Part V
Sales value€26.2mopen-market homes at €406k each without VAT (€461k including 13.5% VAT); Part V homes at cost
Building and development costs−€19.0m€276k a home: house, site works, roads and services, contributions and connections, fees, sales and finance
Builder's profit−€3.4m15% of all costs, including the land
Stamp duty on the land−€261k7.5% of the land price
Land value€3.5m€1.2m a hectare · €483k an acre

If prices or costs move

Costs −10%Costs as aboveCosts +10%
Prices −10%€2.8m€1.7m€495k
Prices as above€4.7m€3.5m€2.3m
Prices +10%€6.5m€5.3m€4.1m

An indication for a first look, not a valuation: a quantity surveyor and a valuer should test it before you bid. At these costs a scheme breaks even, with nothing left for the land, when new homes sell for about €372k including VAT. Costs are the Department of Housing's Cork example for a 110 m² three-bed semi (Q1 2025 prices; Insights into Total Development Costs 2025, Department of Housing (prepared by Mitchell McDermott, December 2025; costs at Q1 2025)). Prices are CSO medians for all new homes in the area, houses and apartments, with VAT removed. Part V homes are counted at cost, a simplification.

Constraints checked

ConstraintResultNearest
Flood Zone A (Galway County Development Plan 2022-2028)None within 100 m—
Flood Zone B (Galway County Development Plan 2022-2028)None within 100 m—
Heritage buildings (national inventory)None within 250 m—
Recorded monumentsNone within 250 m—
Monument zone of notificationNone within 100 m—
Special Area of Conservation1 within 2,000 m
Lough Corrib SAC
918 m
Special Protection Area (birds)None within 2,000 m—

Ground and surroundings

RadonHigh radon areaNew homes need a radon membrane and sump (Building Regulations, Technical Guidance Document C).
Groundwater vulnerabilityExtremeMatters if the scheme needs its own wastewater treatment; on mains drainage it rarely does.
Landslide susceptibilityLowFrom the GSI's national map, at 1:50,000.

Licensed facilities and closed landfills within 500 m (EPA)

Schools and transport within 2 km

Water and wastewater

Uisce Éireann publishes capacity registers for every town, but its terms don't allow them to be reproduced, so they aren't summarised here. Look up the town on the capacity registers, and make a pre-connection enquiry for a Confirmation of Feasibility.

Route forward

From now to starting on site takes about 26–48 weeks (roughly 6–11 months) if there's no appeal. Indicative; each step's range is shown, darker for the quicker end.

Pre-application meeting
Request it early; councils book them weeks ahead.
4–8 wk
Surveys, design and reports
Topographical survey, design, and any reports the route needs.
8–16 wk
Council decision
8 weeks by law; at Galway County Council, 37% of housing decisions took over 10 weeks, usually because of a further-information request.
8–16 wk
Appeal period
Anyone can appeal within 4 weeks of the decision; an appeal adds months.
4 wk
Commencement notice
Lodged at least 14 days before work starts.
2–4 wk

Next steps

  1. You: Commission an Appropriate Assessment screening report.
  2. You: Book a pre-application meeting with the council.
  3. Your builder: Allow for radon measures (Technical Guidance Document C).
  4. Uisce Éireann: Make a pre-connection enquiry for a Confirmation of Feasibility.

Re-check before you bid: the planning data (weekly), the zoned-land tax map (each February), and any permission's expiry date in the council's file.

Questions to ask

The vendor or agent

  • Can you send the folio and title plan (Tailte Éireann Land Registry, landdirect.ie)? Are there rights of way, wayleaves, or pipes and cables crossing the site?
  • Has the owner made a rezoning request or a submission on the zoned-land tax map?

Your architect or engineer

  • Does a scheme of 47–93 homes work, given access, open space, Part V and any buffers?
  • Do we need Appropriate Assessment screening, and what will it cost?
  • Is radon protection (Technical Guidance Document C) allowed for in the build cost?
  • Do our own build costs and sale prices support the indicative land value in this report?

The council

  • Would the council support about 69 homes here, and how would it want Part V delivered?
  • Can we have a pre-application meeting before we submit?

Uisce Éireann

  • Is there water and wastewater capacity for 69 homes? (A pre-connection enquiry gets a Confirmation of Feasibility.)

Sources

Report SR-20261125-GALABCMA016, version 1. Not yet checked. Prepared by Siteline (hello@sitelineplanning.ie). Siteline is a business name of Nathan Brosnan, sole trader, Cork.

This report compiles public information about the site. It isn't planning, legal or valuation advice and doesn't predict a planning decision. Check anything you rely on with the council and your own professionals. Map data is indicative; boundaries come from published map layers, not a survey.