How reports are made
Last updated 25 November 2026
Every fact in a Siteline report comes from a public dataset that’s licensed for re-use, and each report names and dates the data it used. The plain-English parts are written by fixed rules, so the same facts always give the same words. A person checks every report before it’s sent.
Where the facts come from
- Zoning: the Department of Housing’s national zoning map (myplan.ie), plus the plot’s own objective from the 2026 zoned-land tax map. The council’s own plan is the legal source, and the report says so.
- Planning history and permissions: the national planning applications dataset. It covers everything within 300 m of the site, permissions on the site with their expiry dates, and housing schemes of 5 or more homes within 2 km.
- Whether building has started: the National Building Control Office’s commencement notices and completion certificates, kept since March 2014. They show how many homes on the site have started and how many are certified complete.
- Flood zones: councils’ own flood maps where they’re openly licensed (Cork County, Galway County and Roscommon so far). Elsewhere the report says flood isn’t checked and points to floodinfo.ie.
- Heritage and archaeology:
- the National Inventory of Architectural Heritage;
- the Sites and Monuments Record and its zones of notification.
- Protected habitats: Special Areas of Conservation and Special Protection Areas within 2 km.
- Ground:
- the EPA’s high radon areas;
- Geological Survey Ireland’s groundwater vulnerability and landslide susceptibility maps;
- EPA-licensed facilities, quarries and closed landfills within 500 m.
- Schools and stations: OpenStreetMap.
- Prices: the CSO’s median sale prices for new and existing homes in the site’s Eircode area over the last 12 months, and how many homes sold.
- Costs: the Department of Housing’s published breakdown of what it costs to build a typical three-bed semi-detached house.
How many homes could fit
About two-thirds to four-fifths of a site can usually be built on once roads and open space are allowed for. The report multiplies that by a density range:
- the council plan’s own band for the zone, where the plan sets one;
- otherwise the national Compact Settlements Guidelines' range for that kind of town.
If the site already has a live permission, the report uses the permitted number of homes instead, as long as the permission is for at least 5 homes and at least half the bottom of the range. Where there are several, it takes the largest. A house or two permitted on part of a bigger site isn’t the scheme a buyer is weighing, so then the report keeps the range and lists the permission in the site’s planning history.
The indicative land value
It works out what a builder could pay for the land and still cover costs and a normal profit. This is the standard "residual" method:
- Homes × the local new-home price, without VAT, gives the sales value. The 20% of homes that go to the council under Part V are counted at cost.
- Take away the building and development costs, a 15% profit on all costs, and stamp duty on the land.
- What’s left is the land value, shown per acre too.
- A grid shows how it changes if prices or building costs are 10% higher or lower.
It’s an indication for a first look, not a valuation. A quantity surveyor and a valuer should test it before you bid.
If fewer than 30 new homes sold in the area in the last 12 months, the median price can swing a long way on a few sales, and a land value worked out from it would swing further. Then the report gives no land value. It gives the break-even price instead: what new homes would need to sell for to cover the costs and the profit, with nothing left for the land. It also says how much each €10,000 above that adds to the land, so you can work from a local agent’s figure.
If building has already started on the site, and the homes built or under way reach the same bar as a permission, the report gives no land value. It says what’s built and under way instead, because a value for the whole plot as bare land would overstate what’s for sale.
The site outlook
The first page goes through eight checks: zoning, permission, flood, heritage and archaeology, protected habitats, ground, water and services, and homes and value. Any that are a problem, or worth a closer look, get a line of their own; the rest are listed under “no concerns”. The outlook sums them up:
- Straightforward: nothing in the public record stands in the way.
- Some issues: several things need checking or managing.
- Constrained: a serious constraint needs resolving first.
- Not for housing: the zoning doesn’t allow it.
The outlook describes the public record. It never predicts a planning decision or gives odds of approval.
What a report doesn’t cover
- Title: ownership, title and rights of way. Ask for the folio from Tailte Éireann’s Land Registry.
- Water capacity: Uisce Éireann’s capacity registers can’t be reproduced, so the report links to them instead.
- Councils' "reference only" layers: anything published only on those terms.
- Advice: planning, legal, engineering or valuation advice.